The drive is the first thing to account for. Mary Esther runs about 11 miles from our shop in Destin, further than the runs to Shalimar or Lake Lorraine, so a same-day call here gets scheduled into the route rather than squeezed in as a quick add-on. Once the truck's on-site, a straightforward roller-and-track realignment usually runs under two hours.
If the bracket's bent or a track section needs replacing outright, figure closer to half a day, especially if the tech has to true up both sides of the opening, not just the side that failed. We don't sit on parts for common roller and track hardware, so a delay here is almost always about scheduling the drive out, not about waiting on a supplier.